This project has just been completed in time for Christmas. We removed a downstairs bathroom to the rear of the house; we added a downstairs loo and basin and storage cupboard underneath the stairs which involves adding a waste pipe (110mm) under the floor; and we added an ensuite shower room in one of the bedrooms upstairs. We also fitted wooden flooring throughout the downstairs area and tiled the kitchen floor. We knocked through to the garden with double doors whilst blocking up an old single door to the side of the house making way for more kitchen units. We laid a patio outside in the garden making room for an outside table and BBQ (just in time for Christmas!)